Hoppa till innehållet
NC
Network Contracting Office 6
United States

7230--WINDOW TREATMENT

Nov 25, 2026·SAM-7f103824e6c74b1d95c700f0d5fa2fa4
Open
Supplies
Solicitation
5 days left

Deadline approaching

Dec 2, 2026

PublishedDeadline
Nov 25, 2026Dec 2, 2026

Description

Amendment 36C24627Q0113 (P00003) Window Fabric Treatment Questions (Black) / Response (Red) 1. Scope and Quantities The window schedule identifies 96 windows across Pods A, B, C, and D. Amendment 0001 states that the valances will also need fabric. Could the Government confirm whether the 96 scheduled windows represent the complete quantity, and whether valance fabric is included in these quantities or should be priced separately? Response: Valance fabric was included as a full unit to the window. 96 windows = 96 valences. 2. Existing WebbLok Hardware Amendment 0001 indicates that existing WebbLok tracks, brackets, tubes, operators, and valances appear to be in place, except for one missing track in Room S136 Recreation. Could the Government confirm which existing hardware components are expected to be reused and whether the contractor is responsible for replacing the missing track? Response: S136 is not part of this contract. 3. Site Access and Measurements Is there an opportunity for prospective quoters or their proposed installation partners to conduct a pre-award site visit and field measurements? If not, could the Government confirm whether measurements and verification will be permitted immediately after award and before materials are ordered? Response: The measurements is provided in the original solicitation. Government confirms that they will be able to measure prior to ordering as that is listed in the SOW. 4. Installation Phasing and Schedule Could the Government provide an anticipated installation timeframe or expected sequence for Pods A, B, C, and D? Are there any anticipated restrictions on the number of Pods or rooms that may be worked on simultaneously? Response: Installation timeframe is dependent upon the lead time of the fabric offered. Restrictions would include working past 5PM in occupied pods, however, the VA asks to complete rooms all the way through to ensure complete activation (ie: no removing all the blind fabrics and not being able to put it back up by end of day.) 5. Project Experience Requirements The solicitation requires at least five years of healthcare interior design/furniture installation and project management experience, as well as three Federal projects valued at $750,000 or more. Could the Government clarify whether the experience and past-performance qualifications of a proposed subcontractor or installation partner may be considered in satisfying these requirements when the prime contractor is responsible for project management and contract administration? Response: That will qualify. 6. Past Performance Could the Government clarify whether the three Federal projects referenced in the experience requirement must each be valued at $750,000 or more, and whether projects involving window treatment installation or similar healthcare facility interior installations may qualify? Response: Must be valued at $750,000 and similar facility installations qualify. 7. Pricing and Installation The price schedule separates material and installation services by Pod. Could the Government confirm whether installation pricing should include removal and disposal of existing shade fabric, fabric installation on valances, field measurements, project management, training of VA maintenance personnel, cleanup, and punch-list trips Response: Correct, pricing should include installation, measurements, project management, clean-up, and punch list. 8. Product Specification Is the specified Inpro WT Commercial Shade Fabric 25X, 251-10 the required product, or may a technically equivalent product meeting all specified characteristics be offered? If an equivalent product is proposed, could the Government confirm the sample submission process and whether the sample deadline is calculated from the original quotation deadline or the date of actual quote submission? Response: This is addressed in the submission. It is an or equal contract.

Tender details

NC

Network Contracting Office 6

United States

Notice type

Contract notice

Published

Nov 25, 2026

Deadline

Dec 2, 2026

Contract type

Supplies

Main activity

General public services

Solicitation no.

36C24627Q0113

NAICS

337920

Contracting office

HAMPTON, VA

Contact

Ruth A MorrisRuth.Morris@va.gov

Documents

About the contracting office

246-Network Contracting Office 6 · Department of Veterans Affairs

246-Network Contracting Office 6 has 37 open solicitations on SAM.gov right now, and 23 of them close within 14 days. 70% are set aside for small business. This notice gives bidders a 7-day response window, with 5 days left.

Most common sectors at this office: Construction (18), Other services (11), Administrative and support services (3).

All 37 open solicitations from 246-Network Contracting Office 6