Hoppa till innehållet
DO
DIV of Engineering Svcs - Seattle
United States·South Dakota

Rosebud Lift Station Construction

Nov 25, 2026·SAM-2550bb46570d425a8ef929647ca0577a
Open
Services
Solicitation
4 days left

Deadline approaching

Dec 1, 2026

PublishedDeadline
Nov 25, 2026Dec 1, 2026

Description

Amendment A01: 1. The purpose of this solicitation amendment A01 is to update the Contract Specialist. 2. The Contract Specialist and point of contact for this action is changed from Daniel Cotto to Robert Miller. 3. Robert Miller's contact information is Robert.Miller2@ihs.gov, 325-518-0521. 4. All other terms and conditions remain unchanged. The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow. A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration. This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system.

Tender details

DO

DIV of Engineering Svcs - Seattle

United States

Notice type

Contract notice

Published

Nov 25, 2026

Deadline

Dec 1, 2026

Contract type

Services

Main activity

General public services

Solicitation no.

75H70127R00007

NAICS

237110

Contracting office

SEATTLE, WA

Contact

Documents

More tenders

About the contracting office

Div of Engineering SVCS - Seattle · Department of Health and Human Services

Div of Engineering SVCS - Seattle has 7 open solicitations on SAM.gov right now, and 6 of them close within 14 days. 71% are set aside for small business. This notice gives bidders a 6-day response window, with 4 days left.

Most common sectors at this office: Construction (7).

All 7 open solicitations from Div of Engineering SVCS - Seattle