UF

USDA Forest Service
United States·Arkansas
GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis NF
Oct 13, 2026·SAM-afbcb2bf2e9f4110891caff1bfe1c823
Open
Services
Combined Synopsis
15 days leftPublishedDeadline
Oct 13, 2026Oct 29, 2026
Description
On October 13, 2026, amendment 0004 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the proposal due date from 10/14/2026 to 10/29/2026. This amendment must be acknowledged and submitted with your proposal. *************************************************************************************************************************************** On September 30, 2026, amendment 0003 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Extends the proposal due date from 09/30/2026 to 10/14/2026. This amendment must be acknowledged and submitted with your proposal. *************************************************************************************************************************************** On September 17, 2026, amendment 0002 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post RFI questions and answers labeled C05a RFI QA 1240BH26R0013. 2. Post pre-bid sign in sheet labeled C05b Site Visit Sign In 1240BH26R0013. This amendment must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** On August 12, 2026, amendment 0001 to solicitation 1240BH26R0013 - GAOA Blanchard Springs Caverns Tunnel Rehabilitation in Ozark-St. Francis National Forest has been posted to SAM.gov and accomplished the following: 1. Post Golder Specifications labeled “C04m Attachment 11 Golder 1240BH26R0013.” This SF30 must be acknowledged and submitted with your proposal. *********************************************************************************************************************************************** This project includes all labor, equipment, supplies, testing & inspections, and incidentals necessary for the Blanchard Springs Caverns (BSC) Dripstone and Discovery Trail Infrastructure repairs and safety upgrades. All work shall conform to the attached Drawings and Specifications. All work shall be performed by qualified and licensed contractors for all trades applicable. Work includes but is not limited to structural stabilization of tunnel entrance and exits, disposal and removal of existing supports, masonry repairs, Installation of Instrumentation & monitoring equipment, replacement of existing air lock doors at entrance and exits, replacement of existing security doors at entrance and exits, replacement of existing suspended ceiling system, components, and associated ductwork, replacement of existing bypass tunnel door, replacement of existing lighting and distribution system components, replacement of existing safety handrails, and replacement of the existing mine phone system and components.
Tender details
UF

USDA Forest Service
United States
Notice type
Contract notice
Published
Oct 13, 2026
Deadline
Oct 29, 2026
Contract type
Services
Main activity
General public services
Set-aside
Small Business Set Aside - Total
Solicitation no.
1240BH26R0013
NAICS
Specialty trades (238990)
Contracting office
WASHINGTON, DC
Contact
James Edingtonjames.edington@usda.gov