ED
Engineer District Tulsa
United States

Sewage Ejector and Line Assessment

Sep 28, 2026·SAM-8e92004d969d4ab59e9ce1976905300d
Open
Services
Solicitation
E-submission
15 days left
PublishedDeadline
Sep 28, 2026Oct 28, 2026

Description

This scope of work requires the contractor to locate, inspect, and modify an unmapped 700 to 800 foot concrete-encased four inch cast iron sewer line and its associated distribution box, with mandatory Government presence during all site inspections. Key tasks include installing concrete-encased Schedule 40 PVC double-Y clean-outs every 300 feet, exposing and inspecting the distribution box and its 2009 leach field connections, and extending the box cover using a riser and structural cover rated for three ton vehicle traffic protected by four concrete-encased steel safety-yellow bollards. All physical, material, and dimensional adjustments must be documented as Red Line As-Builts on the reference drawing, and any recommended corrective actions for the lateral lines must be delivered via a detailed findings report with comprehensive labor and material cost estimates.

Tender details

ED

Engineer District Tulsa

United States

Notice type

Contract notice

Published

Sep 28, 2026

Deadline

Oct 28, 2026

Contract type

Services

Main activity

Defence

Solicitation no.

W912BV26QA069

NAICS

237110

Contracting office

TULSA, OK

Documents

More tenders

Sewage Ejector and Line Assessment | Tendoer